8-8 Maintenance and Calibration
PLZ-4W
CC mode calibration (calibration number 1, 2, and 3)
Carry out calibration on the low range items
fi
rst according to steps A to D. Then,
carry out calibrations for Mid range and High range.
Table 8-2
Overview of the procedure
■
Low range calibration
Step A: Calibration of the offsets of internal reference voltage for out-
put setting and measured value
1.
Connect a shunt resistor that matches the value corresponding to 10 %
of the low range full scale.
2.
Press the or CURSOR key to select the calibration number “1. CC
(Low)”.
3.
Connect a CV power supply to the load input terminal and apply 5 V.
Set the current of the power supply approximately in the range of 2 % to
5 % of the rated current of the load device.
4.
Press the ENTER key.
The load automatically turns on, and the offset calibration (CC (Low) Offset
Adjustment) screen appears.
Procedure
Current
range
Percentage with
respect to the full
scale
(%)
Calibration item
Internal reference
voltage for output set-
ting
Measured value
Internal reference
voltage for protection
function setting
Offset
Gain
Offset
Gain
Offset
Gain
A
Low
10
–
–
–
–
B
–
–
–
–
–
C
100
–
–
–
–
D
–
–
–
–
–
A
Mid
10
–
–
–
–
B
–
–
–
–
–
C
100
–
–
–
–
D
–
–
–
–
–
A
High
10
–
–
–
–
B
–
–
–
–
–
C
100
–
–
–
–
D
–
–
–
–
–
Summary of Contents for PLZ-4W Series
Page 10: ...VIII Contents PLZ 4W ...
Page 20: ...1 10 General Information PLZ 4W ...
Page 38: ...2 18 Installation and Preparation PLZ 4W ...
Page 90: ...5 30 Basic Operation PLZ 4W ...
Page 192: ...9 10 Specifications PLZ 4W ...
Page 214: ...A 22 Appendix PLZ 4W ...