6-64 Applied Operation
PLZ-4W
Parallel connection procedure
Connect the master unit and slave units using optional
fl
at cables. Connect to the
equipment under test using load wires. For a description of the wiring procedure
and wire diameter, see section 2.8, “Load Wiring.”
• Use a load wire with suf
fi
cient diameter for the current as well as non-
fl
am-
mable or
fl
ame-resistant cover.
1.
Check that the power is turned off.
Check that the power of all units to be connected is turned off.
2.
Connect the load input terminal of each unit.
Refer to the connection diagram of Fig. 6-49 and securely connect the load
input terminals of the units of the same model in parallel.
3.
Connect the external control connector of each unit.
Connect the J1 and J2 connectors of each unit in parallel using
fl
at cables.
Carry out the work carefully as improper connection of the J1 and J2 connec-
tors can damage the PLZ-4W.
Setup procedure of the master/slave units
1.
Turn on the power of each unit.
Turn on the POWER switch of all units at once or turn on the POWER switch
of slave units
fi
rst to turn on the power to all units.
2.
Select the menu setup.
Press the MENU (SHIFT+SET/VSET) key.
The the menu appears.
3.
Select Con
fi
guration
Press the or CURSOR key several times until Con
fi
guration is high-
lighted. When highlighted, press the ENTER key.
4.
Select Master/Slave
Press the or CURSOR key several times until Master/Slave is high-
lighted. When highlighted, press the ENTER key.
5.
Set the master and slave units.
Check to see that the cursor (blinking) is at the Operation item. If the cursor is
at some other item, press the CURSOR key several times to move the cursor
to Operation.
CAUTION
Summary of Contents for PLZ-4W Series
Page 10: ...VIII Contents PLZ 4W ...
Page 20: ...1 10 General Information PLZ 4W ...
Page 38: ...2 18 Installation and Preparation PLZ 4W ...
Page 90: ...5 30 Basic Operation PLZ 4W ...
Page 192: ...9 10 Specifications PLZ 4W ...
Page 214: ...A 22 Appendix PLZ 4W ...