PLZ-4W
General Information 1-5
The sequence pattern can be edited easily using the large LCD.
■
Useful function for battery discharge tests
The PLZ-4W can measure the time from load on to load off.
When combined with the under voltage protection (UVP) function, the time from
when the battery discharge is started until the battery voltage falls to the cutoff volt-
age can be measured (time measurement).
In voltage measurement, the voltage immediately before the load turns off is mea-
sured. If you set a timer to turn off the load after a speci
fi
ed time elapses, you can
measure the closed circuit voltage after a speci
fi
ed time elapses from the start of
battery discharge (voltage measurement).
■
Load booster
To achieve large capacity at low cost, the PLZ1004W comes with a load booster
(PLZ2004WB).
Using a single PLZ1004W as a master unit, up to four load boosters can be con-
nected in parallel (9 kW, 1800 A maximum).
■
Standard GPIB, RS232C, and USB communication functions
Because the electonic load comes standard with GPIB, RS232C, and USB commu-
nication functions, it can easily be incorporated into wide-ranging test and inspec-
tion systems.
Wide variety of systems can be con
fi
gured when combined with the sequence func-
tion.
Summary of Contents for PLZ-4W Series
Page 10: ...VIII Contents PLZ 4W ...
Page 20: ...1 10 General Information PLZ 4W ...
Page 38: ...2 18 Installation and Preparation PLZ 4W ...
Page 90: ...5 30 Basic Operation PLZ 4W ...
Page 192: ...9 10 Specifications PLZ 4W ...
Page 214: ...A 22 Appendix PLZ 4W ...