PBZ
9
Differences between Preset and Setup
Memory...................................................
76
Primary Usage ...........................................
76
Preset Memory ...............................................
77
Saving Settings to Preset Memory.............
77
Loading Preset Memory Entries.................
78
Setup Memory ................................................
79
Saving Settings to Setup Memory..............
80
Loading Setup Memory Entries..................
80
Response Setting ...........................................
81
Setting Procedure ......................................
81
Examples of Responses ............................
82
Load Resistance and Frequency Responses .
83
Configuration (CONFIG).................................
84
List of CONFIG Settings ............................
84
Setting and Viewing CONFIG Settings ......
85
CONFIG Setting Details .................................
86
CONFIG[1]: Mode, Response, and Remote
Sensing...................................................
86
CONFIG[2]: Signal Source, External Signal
Circuit Gain, and the Power-On State ....
87
CONFIG[3]: Synchronous Operation, Trigger
Signals, and Output-On Logic ................
89
CONFIG[4]: Memory, Key Lock, and the
Buzzer ....................................................
90
CONFIG[5]: Master or Slave Unit in Parallel
Operation................................................
91
CONFIG[6]: Interface (GPIB, RS232C, USB,
and LAN) ................................................
92
CONFIG[7]: Model Information ..................
94
Sequence Feature ..........................................
96
Creating Sequences (Scripts, Programs, and
Steps) .....................................................
96
Sequence Execution Methods ...................
97
Executing Sequences across Multiple
Synchronized Units.................................
98
Editing Programs and Steps...........................
99
Editing Programs .....................................
Editing Steps............................................
Step Settings ................................................
Step Settings............................................
Practical Examples of Step Settings (PBZ20-
20) ........................................................
110
Executing Programs .....................................
112
Executing Programs (RUN) .....................
113
Aborting Programs (ABORT) ...................
114
Pausing Programs (PAUSE)....................
114
Pausing Programs to Wait for Trigger Input
Signals (WAIT) .....................................
115
Remedying Alarm Generation..................
115
Setting the Protection Features during
Program Execution ...............................
116
Setting the Measurement Feature during
Program Execution ...............................
116
Editing Scripts...............................................
117
Editing Script1..........................................
117
Editing Script2 ..........................................
119
Executing Scripts .........................................
121
Executing a Script (RUN) ........................
122
Operations Other than Script Execution..
123
Program Examples ......................................
124
Example 1: A DC Signal..........................
124
Example 2: Superimposing an AC Signal on a
DC Signal.............................................
126
Example 3: Changing a DC Signal Using a
Trigger Signal Input .............................
128
Example 4: Generating an AC Signal Using a
Trigger Signal Input .............................
130
Example 5: Performing a Ramp Transition
That Takes Longer than 1000 Seconds .....
132
External Control,
Parallel Operation,
and Synchronization
External Control ...........................................
134
About the J1 Connector ..........................
134
Controlling DC Signals (The DC Settings)
136
Using External Voltage............................
136
Using External Resistance ......................
137
Turning Output On and Off ..........................
138
Shutting Down the PBZ ...............................
140
Signal Output ...............................................
141
Parallel Operation ........................................
142
Using the Parallel Operation Kit ..............
142
Installation ...............................................
143
Connection ..............................................
144
Remote Sensing......................................
146
Turning the POWER Switch On ..............
146
Specifying the Master Unit, the Slave Units,
and the Number of Units in Parallel
Operation .............................................
146
Turning Output On and Off......................
146
Turning the POWER Switch Off ..............
146
Synchronization Feature..............................
147
Connection Procedure ............................
147
Configuring the Synchronization Feature
148
The Functions of the TRIG IN and TRIG OUT
Terminals .............................................
148
Turning Output On and Off......................
149
Turning Output On when the POWER Switch
Is Turned On........................................
149
Setting the Signal Source........................
150
Executing Sequences .............................
151
Clock Synchronization.............................
152
Cleaning and Inspection ..............................
154
Backup Battery Replacement..................
155
Summary of Contents for PBZ20-20
Page 11: ...PBZ 11 ...
Page 18: ...18 PBZ ...
Page 95: ...Sequences This chapter explains sequences ...
Page 153: ...Maintenance This chapter describes how to clean and inspect the PBZ ...
Page 156: ...156 PBZ Maintenance ...