PBZ
143
Parallel Operation
5
Exte
rnal
Con
trol,
Pa
ralle
l Operation, an
d Synchronizat
ion
Installation
1
Decide which PBZ you will use as the master unit.
2
Turn the master and slave units off.
3
Install the master and slave units.
●
PK01-PBZ
Attach brackets to the left and right sides.
●
PK02-PBZ or PK03-PBZ
Remove the feet from the bottom panels, attach rack mount brackets (KRB3-TOS or
KRB150-TOS), and mount the PBZs on a rack.
Screws for the load cables (M5-10L)
2
2
Parallel operation signal cable
1
1
Brackets
2
-
Screws for the brackets (M4-8L)
8
-
Parallel output terminal cover
1
-
Spacers
4
-
Component
PK01-PBZ
PK02-PBZ / PK03-PBZ
Two brackets
(one bracket per side)
Eight 8 mm M4 screws for the brackets
(four screws per side)
Master unit
Slave unit
See
Master unit
Slave unit
Summary of Contents for PBZ20-20
Page 11: ...PBZ 11 ...
Page 18: ...18 PBZ ...
Page 95: ...Sequences This chapter explains sequences ...
Page 153: ...Maintenance This chapter describes how to clean and inspect the PBZ ...
Page 156: ...156 PBZ Maintenance ...