Switch or circuit breaker to be used for direct connection
to commercial power supply (AC line)
1.
Turn off the switches on the switchboard.
2.
Connect the grounding terminal on the switchboard to G of the
SOURCE terminal.
The customer is required to obtain an installation wire. Select the rated current of the
wire according to the input current of the EUT.
3.
As shown in Fig. 2-9, install the switch or circuit breaker between the
SOURCE terminal and the commercial power supply (AC line).
Match the polarities (L, N, and G) of the terminal and switchboard to each other. The
customer is requested to prepare the switch or circuit breaker and wires.
Turn on the switches on the switchboard and installed switch or circuit breaker
immediately before starting a test.
L
N
G
EUT
G N L
G N L
Voltage sensing terminal
External signal
input terminal
LOAD terminal
S
OURCE terminal
To switches on switchboard
S
witch or circuit breaker
See
Summary of Contents for KHA1000
Page 1: ...Part No Z1 003 482 I0043901 Oct 2021 Operation Manual Harmonic Flicker Analyzer KHA1000 ...
Page 8: ...vi KHA1000 ...
Page 20: ...xviii KHA1000 Rear panel 1 2 3 4 5 6 7 8 9 10 11 12 13 14 ...
Page 22: ...xx KHA1000 ...
Page 23: ...Overview This chapter provides an overview of the product and explains its features 1 ...
Page 30: ...1 8 KHA1000 ...
Page 68: ...3 20 KHA1000 ...
Page 69: ...Basic Operation This chapter explains basic operation methods 4 ...
Page 156: ...5 54 KHA1000 ...
Page 260: ...9 6 KHA1000 ...
Page 261: ...Specifications This chapter explains the specifications of this product 10 ...
Page 272: ...I 4 KHA1000 ...
Page 273: ......