34
Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
Tattoo™
Screens - Spine Screen Trim
Assembly Instructions
In-Line Spacer Installation with
Flex Screen Intersection
Note:
All screens must be
mechanically connected together,
with all 10-wire rigid wireways and
screen-to-screen power connections
appropriately installed before adding
power infeed, or connecting infeed to
power source.
Note:
The power infeeds are to be
connected to the power source by
a qualified electrician who must
follow all state and local codes at the
building site and check the electrical
integrity of the finished system.
1. Per the space-planning layout,
determine the location for in-line
spacer. Make sure that the screens to
receive the spacer are near their final
location, and are plumb and level.
2. The two required screen connectors
come with eight molding clips
installed to each (shown uninstalled,
Figure 38), four on each side. At
Spine Screen #1's end, as illustrated,
position the screen connector up
against the vertical frame channel of
Spine Screen #1, with clips oriented
as shown. Using a firm hand, press
at the mounting clips on the screen
connector, one at a time to seat them
into the vertical frame channel at the
end of the Spine Screen #1
(Figure 38 & Detail XX).
3. Position the spacer as illustrated with
the bottom backside "tongue" facing
the end of the adjoining Flex Screen
to install. If the spacer top is higher
than the top of the Spine Screen #1's
horizontal frame, the spacer is too
tall at the top and must be squarely
cut off from the bottom. Cut required
amount off the bottom, then press the
side of the spacer with the molding
clips in the vertical frame channel on
Spine Screen #1 taking care to align
the top of the spacer with the top of
the screen's horizontal frame. Press
forcefully from inside the spacer, to
engage the screen connector/clips of
Spine Screen #1 into the channel of
the spacer into an open end of a
10-wire rigid wireway (Figure 38).
4. Carefully lift and arrange the Flex
Screen foot under the perpendicular
Spine Screen foot, aligning the Flex
Screen against the spacer during the
process (Figure 38).
Figure 38
Spine
Screen
(#1)
Spine
Screen
(#2)
spacer
(in-line)
screen
connector
molding
clip
vertical
spacer
channel
Flex
Screen
bridge
foot
adjustable
glide foot
bottom
backside
“tongue”
Detail XX
Spine
Screen
(#1)
screen
connector
molding clip
(factory installed)
spacer
(in-line)
vertical
frame
channel