20
Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
Tattoo™
Screens - Spine Screen 10-Wire Power
Assembly Instructions
10-Wire Base Power Infeed
(End-of-Run) Installation
Important:
If the Spine Screen
System is to be installed with New
York City electrical, reference the
Tattoo Screen System - New York
City Electrical Assembly Instructions
(KI-AI-000045), and proceed to the
"New York City Infeed Electrical Box"
instructions on page 4.
Note:
The power infeeds are to be
connected to the power source by
a qualified electrician who must
follow all state and local codes at the
building site and check the electrical
integrity of the finished system.
Note:
All screens must be
mechanically connected together,
with all 10-wire rigid wireways and
screen-to-screen power connections
appropriately installed before adding
power infeed, or connecting infeed to
power source.
1. Per the space-planning layout,
determine the location for base
power infeed. Make sure that screen
to receive base power infeed is in
its final location, and is plumb and
level.
2. At the bottom of the screen frame
which will receive base power infeed,
route the plug end of the 10-wire
base infeed conduit through the
pass-through ankle and plug it into
the end of the 10-wire rigid wireway
(Figure 17).
3. On the rib side of the end-of-run
base infeed trim, space molding clips
evenly apart and press them onto the
ribs of the trim as illustrated
(Figure 18).
4. Position the end-of-run base infeed
trim with molding clips up against
the vertical frame channel. Align the
top of the trim with the bottom of the
horizontal frame and position the
10-wire base infeed through the
U-shaped cutout. Using a firm hand,
press to snap molding clips of the
end-of-run base infeed trim into the
vertical frame channel (Figure 18).
Spine
Screen
vertical
frame
channel
vertical
frame
pass-through
ankle
10-wire base
power infeed
exposed
10-wires
Figure 17
Figure 18
Spine
Screen
10-wire
base infeed
vertical
frame
channel
vertical
frame
end-of-run
base infeed
trim
molding
clip
horizontal
frame
end-of-run
corner
cap
#10-24 x / ”
Torx screws
3
8
5. Place the end-of-run corner cap into
the notch formed on the top corner
of the horizontal frame. Align the
mounting holes on the horizontal
frame with the mounting holes on
the corner cap and secure with two
#10-24 x
3
/
8
” Torx screws
(Figure 18).