30
Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
Tattoo™
Screens - Spine Screen Hardwired Electrical
Assembly Instructions
Hardwired Electrical Base Power
Infeed Trim Installation
Note:
City of Chicago requires the
use of hardwired electrical. Conduit,
wiring and receptacles are customer
supplied.
Note:
The power infeeds are to be
connected to the power source by
a qualified electrician who must
follow all state and local codes at the
building site and check the electrical
integrity of the finished system.
Note:
All screens must be
mechanically connected together,
with all connections appropriately
installed before adding power infeed,
or connecting infeed to power
source.
1. Per the space-planning layout,
determine the location for the
hardwired base power infeed. Make
sure that the screen to receive the
base power infeed is in its final
location, and is plumb and level.
2. On the rib side of the base infeed
vertical trim, space molding clips
evenly apart and press them onto the
ribs of the vertical trim as illustrated
(Figure 31).
3. Position the base infeed vertical
trim with molding clips up against
the vertical frame channel that will
receive hardwired base power infeed.
Align the top of the trim with the
bottom of the horizontal frame. Using
a firm hand, press along the vertical
trim at the molding clip locations
to snap clips into the vertical frame
channel (Figure 31).
4. Place the end-of-run corner cap into
the notch formed on the top corner
of the horizontal frame. Align the
mounting holes on the horizontal
frame with the mounting holes on the
corner cap and secure with two
#10-24 x
3
/
8
” Torx screws
(Figure 31).
5. At the bottom of the screen frame
which will receive hardwired base
power infeed, follow all state and
local codes at the job site and install
conduit, wiring and receptacles per
space-planning layout.
6. Install the base raceway trim by
aligning the receptacles with the
openings in the base raceway trim,
then engage the base trim lip with the
bottom wireway channel (Figure 32
& Detail PP).
Spine
Screen
base infeed
vertical trim
molding
clip
vertical
frame
channel
vertical
frame
empty
junction box
Figure 31
end-of-run
corner
cap
#10-24 x / ”
Torx screws
3
8
Spine
Screen
pass-through
ankle
base infeed
vertical trim
base
raceway trim
(hardwired)
electrical-added
hardwired
Figure 32
base
trim lip
Detail PP
base
raceway
trim
bottom
wireway
channel