Maintenance
Maintenance during Long-Time Parking
Maintenance during Long-Time
Parking
Parking Procedure
If it’s necessary to park the machine for ≥30
days, please park the machine indoors. If it’s
necessary to park outdoors, please park the
machine on a wood-paved level ground and
cover the machine by water-proof cap to keep
dry.
1. Clean the machine.
2. Check for oil/water leakage and cracking
and check for any loose nut or bolt.
3. Refuel and replace hydraulic oil and
lubricating oil.
4. To prevent rusting and freezing, replace
the engine coolant with long-life coolant
(LLC).
5. Lubricate the grease fitting by a grease
gun.
6. Fully retract the bucket and bucket arm
cylinders and lower the bucket and
bulldozing blade onto the ground.
7. Apply anti-rusting oil to the hydraulic
cylinders.
8. Disconnect the negative cable of battery
and cover the battery to guard against
freezing.
During Parking
Warning
●
Do not operate the machine in an
enclosed place with poor ventilation.
●
If the natural ventilation is not possible,
install ventilation fan, fan, extended
exhaust pipe, or other ventilation device.
1. To prevent rusting, operate the machine
once a month to circulate the oil
throughout whole system.
2. Check the battery and when necessary
charge the battery. Please ask your sales or
service dealer for charging.
5-44
Start of Machine after Parking
Important:
If the above-mentioned
“Parking procedure” is not followed during the
long-time parking of machine, please consult
with your sales or service dealer before
restarting the machine.
1. Wipe away the lubricating oil from the
piston rods of the hydraulic cylinders.
2. When necessary, add lubricating oil or
grease.
Reuse of Engine
1. Fulfill the daily checking.
2. Pte-lubricate the engine before start.
a. Crank the engine for 15s and notice to
keep the fuel system closed to
prevent start of engine.
Summary of Contents for XN10-8
Page 9: ...Safety 1 1...
Page 44: ...Safety Safety Signs 1 36...
Page 49: ...Controls 2 1...
Page 55: ...2 7 Records...
Page 64: ...Operations 3 1...
Page 87: ...Operations Parking of This Machine Locking Ensure to lock the following parts 3 24...
Page 93: ...Transportation 4 1...
Page 97: ...Transportation Lifting of Machine 4 5 unit mm...
Page 99: ...Maintenance 5 1...
Page 112: ...5 14 Records...
Page 120: ...5 22 Records...
Page 130: ...5 32 Records...
Page 132: ...5 34 Records...
Page 144: ...Troubleshooting 6 1...
Page 155: ...Parameters 7 1...
Page 159: ...Parameters Lifting power 7 5...
Page 160: ...7 6 Records...
Page 161: ...Optional products 8 1...
Page 170: ...8 10 Records...
Page 172: ...Optional products Canopy 8 12...
Page 173: ...Parts number position Upper frame number 20060001 8 13...