OPERATION
Version 03/2008
WATERCLEAN 1600
- 72 -
3.7
Winter Operation
During winter operation it is necessary to heat the water treatment
plant. For heating the container inside of the WTC 1600 C the built-in
A/C must be used..
Additionally, frost-protection measures are to be taken outside of the
container.
WARNING
It must be ensured that system, when filled with water, is
not subject to freezing (also during operating intermissi-
ons) at any point of time. Otherwise, considerable dama-
ges are possible due to frost.
Summary of Contents for WATERCLEAN 1600
Page 2: ......
Page 14: ...GENERAL Version 03 2008 WATERCLEAN 1600 8 ...
Page 28: ...DESCRIPTION Version 03 2008 WATERCLEAN 1600 22 Fig 13 Anti scalant mounting kit 1 2 ...
Page 48: ...DESCRIPTION Version 03 2008 WATERCLEAN 1600 42 ...
Page 82: ...OPERATION Version 03 2008 WATERCLEAN 1600 76 ...
Page 106: ...APPENDIX Version 03 2008 WATERCLEAN 1600 100 ...
Page 108: ......
Page 110: ......