12 Decommissioning, Storage and Transport
12.1 Putting Out of Operation
This is necessary under the following circumstances:
■ The machine is temporarily not needed.
■ The machine is to be moved to another location.
■ The machine is to be scrapped.
Temporarily putting out of operation
Precondition The machine can be started at regular intervals.
➤ Run the machine once a week for at least 30 minutes under LOAD to ensure sufficient protec‐
tion against corrosion.
Putting out of operation for a longer period
Precondition Before putting out of operation, the machine should be run under LOAD for at least 30 minutes.
Switch off the mains disconnecting device,
the disconnect device is locked in the off position,
check that no voltage is present.
Machine fully vented (no pressure).
1. Allow the machine to cool down completely.
2. Disconnect all air and electrical connections.
12.2 Packing
A wooden crate is required for overland transport to protect the machine from mechanical damage.
Other measures must be taken for the transport of machines by sea or air. Please contact
KAESER SERVICE for more information.
Material Desiccant
Plastic sheeting
Wooden crate
Precondition The machine is decommissioned.
The machine is dry and cooled down.
1. Place sufficient desiccant silica gel or desiccant clay) in the machine.
2. Wrap the machine fully in plastic sheeting.
3. Protect the machine in a wooden crate against mechanical damages.
12.3 Storage
Moisture can lead to corrosion, particularly on the surfaces of the airend and in the oil separator
tank.
Frozen moisture can damage components, valve diaphragms and gaskets.
12 Decommissioning, Storage and Transport
12.1 Putting Out of Operation
82
Service Manual Screw Compressor
ESD 442/14 bar (abs) SFC SIGMA CONTROL 2
ESD_2C_10357405_10–LIN_00 E
Summary of Contents for ESD 352 SFC
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 171: ...KKW SSC 2 03 en 01 BA SIGMA CONTROL FLUID KKW SSC 2 03 01 20130805 113302...
Page 173: ......
Page 175: ...Contents ii Quick user guide Controller SIGMA CONTROL 2 SCREW FLUID 1 1 3 9_9450 03 USE...
Page 215: ...Contents iv Service manual Controller SIGMA CONTROL 2 SCREW FLUID 1 1 3 9_9450 03USE...
Page 392: ...KKW GBASE 1 00 en ERSATZTEILE 10357405_10 ESD 2C 20130903 115349...