➤ Before starting the machine, check for the following:
■ increased consumption of oil, coolant or fuel
■ loose components or leakage
■ worn or damaged drive belts
■ worn or defective cable assemblies
■ smell of fuel
■ electrical smell
➤ When the motor is running, be alert for unusual system noises that may indicate the need for
servicing or maintenance work.
Result When problems occur, take appropriate action to address malfunctions or contact
KAESER SERVICE.
10.3.3 Maintenance tasks after commissioning
The table below lists maintenance tasks required after commissioning (initial start-up).
➤ Carry out maintenance tasks according to the following schedule.
Component:
Task
E
50
N
ot
e
Engine:
Check the fuel lines and clamps.
If necessary, tighten the hose
clamps.
X
KS; SW
E50 = after the first 50 operating hours
KS = contact KAESER SERVICE; SW = contact specialised workshop
Tab. 71 Maintenace tasks on the machine after commissioning
10.3.4 Regular maintenance tasks
The following table lists the various maintenance intervals for the machine.
Maintenance interval
Short description
Daily
–
Every 250 h, at least annually.
A250
Every 500 h, at least annually.
A500
Every 1000 h, at least annually.
A1000
Every 1500 h, at least annually.
A1500
Every 2000 h, at least every two years.
A2000
Every 3000 h, at least every 3 years.
A3000
Every 36000 h, at least every 6 years.
A36000
Tab. 72 Maintenance intervals and regular maintenance tasks
The table below lists regular maintenance tasks.
10 Maintenance
10.3 Maintenance schedules
No.: 901779 08 USE
Operator Manual Portable Rotary Screw Compressor
MOBILAIR M58utility SIGMA CONTROL SMART
99