Table 56: ETC board components
Location
Label
Description
Function and comments
LPS1
Low Pressure Switch 1
If a unit is calling for compressor operation
and after the stabilization period expires,
LPS1 detects an open contact, the
compressor will stop and the anti-short
cycle delay will start.
HPS1
High Pressure Switch 1
If a unit is calling for compressor operation
and HPS1 detects an open contact, the unit
compressor will stop and the anti-short
cycle delay will start.
LPS2
Low Pressure Switch 2
If a unit is calling for compressor operation
and after the stabilization period expires,
LPS2 detects an open contact, the
compressor will stop and the anti-short
cycle delay will start.(For units with 2-stages
of refrigeration)
D
HPS2
High Pressure Switch 2
If a unit is calling for compressor operation
and HPS2 detects an open contact, the unit
compressor will stop and the anti-short
cycle delay will start.(For units with 2-stages
of refrigeration)
C1
1 Contactor
Output to Compressor
C2
2 Contactor
Output to Compressor (2 stage units only)
FAN 1
Fan Contactor
Output to Indoor Fan
FAN 2
No Connection
E
CN-FAN
Condenser Fan Contactor
Output to Condenser Fan Contactor
MV
Gas Valve Input
(Gas units only)
H2
H2 Output
Stage 2 Gas/Electric Heat ContactorFor
F
H1
H1 Output
Stage 1 Gas/Electric Heat Contactor
VFD
G
C
VFD Output
For use with Intellispeed OptionH1
FS1
Evaporator Freeze Stat
For low evaporator temperature – Set for
26°F
H
FS2
Evaporator Freeze Stat
For low evaporator temperature – Set
for 26°F (only used for dual compressor
operation)
I
PB1
Push Button Reset
Clears alarms and the stored alarms in
memory
J
LED
LED Operation
See the Fault Code table
T1
Heat-Off-Delay
60 Seconds (Default)
T2
Heat-Off-Delay
90 Seconds
K
T3
Heat-Off-Delay
120 Seconds
2COMP
Compressor Selection
2-Stage Compressor (default)
L
1COMP
Compressor Selection
1-Stage Compressor
ELEC
Electric Heat
PowerSelection for Electric Heat (default)
M
GAS
Gas Heat
PowerSelection for Electric Heat (default)
C
24VAC Power
N
24V
24VAC Power
O
LIMIT
Limit switch
Shall be interlocked to the fan relay. (When
power is interrupted from this input, the fan
will be forced on by software)
Everyday Thermostat Control operation
Compressors are controlled by the Y1 through Y2
thermostat inputs.
Single Stage Cooling Configuration
•
When Y1 is energized the CN-FAN, FAN1,
and C1 outputs will energize, and the indoor
fan VFD will run at 67% speed. When Y2 is
energized, FAN2 output 2 will energize and
the VFD will run at 100% (but only if C1 is
“on”).
INSTALLATION MANUAL ZY SERIES 3 - 10 ton 60 Hertz R-410A
101
Johnson Controls Ducted Systems
Summary of Contents for ZY Series
Page 2: ...2 INSTALLATION MANUAL ZY SERIES 3 10 ton 60 Hertz R 410A Johnson Controls Ducted Systems ...
Page 140: ...INSTALLATION MANUAL ZY SERIES 3 10 ton 60 Hertz R 410A 140 Johnson Controls Ducted Systems ...
Page 141: ...INSTALLATION MANUAL ZY SERIES 3 10 ton 60 Hertz R 410A 141 Johnson Controls Ducted Systems ...
Page 142: ...INSTALLATION MANUAL ZY SERIES 3 10 ton 60 Hertz R 410A 142 Johnson Controls Ducted Systems ...
Page 143: ...INSTALLATION MANUAL ZY SERIES 3 10 ton 60 Hertz R 410A 143 Johnson Controls Ducted Systems ...