REV 02 OCT 2020 JLT4500-IOM-F
59
11.2 ANNUAL CHECKS
Check report
This report is record of all audits for operation conducted and recorded by an inspector or expert.
This lift was audited on DATE: ______________________________ and subjected to testing for operational readiness.
Describe deficiencies found (if any)
Extent of the Check:
Pending Checks (if any):
If there are (no*) concerns to limit this lift for operation. Additional verification is not required. (* = Delete if not applicable)
Place and Date
Inspector’s Signature
Name and address in block letters
Job Description and Company
Operator or Agent
Notes on defects
Place and Date
Signature
Issues Fixed
Place and Date
Signature
Verification
This Lift has been verified on _______________________________.
The unsatisfactory performance of the first examination has not been corrected?
Summary of Contents for JLT4500S
Page 3: ...REV 02 OCT 2020 JLT4500 IOM F 3 ...
Page 13: ...REV 02 OCT 2020 JLT4500 IOM F 13 Fig 3 General Specifications Service Bay Layout ...
Page 46: ...REV 02 OCT 2020 JLT4500 IOM F 46 9 1 PARTS BREAKDOWN OF FINAL ASSEMBLY Fig 38 FINAL ASSEMBLY ...
Page 54: ...REV 02 OCT 2020 JLT4500 IOM F 54 9 6 PARTS BREAKDOWN OF CARRIAGE AND ARMS ...
Page 64: ...REV 02 OCT 2020 JLT4500 IOM F 64 Check Report Summary Description Date and Name ...
Page 66: ...REV 02 OCT 2020 JLT4500 IOM F 66 12 2 WIRING DIAGRAM FOR SINGLE PHASE SHEET 2 3 ...
Page 67: ...REV 02 OCT 2020 JLT4500 IOM F 67 12 3 WIRING DIAGRAM OF CONTROL BOXES SHEET 3 3 ...
Page 68: ...REV 02 OCT 2020 JLT4500 IOM F 68 12 4 WIRING DIAGRAM OF THE ELECTRICAL SYSTEM ...
Page 70: ...REV 02 OCT 2020 JLT4500 IOM F 70 13 FOUNDATION PLAN ...