REV 02 OCT 2020 JLT4500-IOM-F
21
Fig.10, Install the Mounting Bracket Fig.11, Power Unit Mounting
14) Assemble Power Unit (EAH0072T07A) to Power Column Extension (EAM0138V97A), DO NOT fill with oil at this time, see
Fig.11
15) Install Bulkhead fitting (EAH0072T09A) onto the power side extension column, then connect the Tee Branch Fitting (EAH0065V22A)
with the bulkhead fitting from inside of the power side extension column, see
Fig.12
.
Fig.12, Assemble Bulkhead and Tee fitting, Routing Power side hose
16) Route power side hose EAH0072T01A through column extension and connect to tee branch fitting EAH0065V22A, See
Fig.12
.
EAH0072T10A
1-22388A
EAH0072T09A
EAH0065V22A
Power Unit
EAH0072T01A
Power Side Column Extension
Summary of Contents for JLT4500S
Page 3: ...REV 02 OCT 2020 JLT4500 IOM F 3 ...
Page 13: ...REV 02 OCT 2020 JLT4500 IOM F 13 Fig 3 General Specifications Service Bay Layout ...
Page 46: ...REV 02 OCT 2020 JLT4500 IOM F 46 9 1 PARTS BREAKDOWN OF FINAL ASSEMBLY Fig 38 FINAL ASSEMBLY ...
Page 54: ...REV 02 OCT 2020 JLT4500 IOM F 54 9 6 PARTS BREAKDOWN OF CARRIAGE AND ARMS ...
Page 64: ...REV 02 OCT 2020 JLT4500 IOM F 64 Check Report Summary Description Date and Name ...
Page 66: ...REV 02 OCT 2020 JLT4500 IOM F 66 12 2 WIRING DIAGRAM FOR SINGLE PHASE SHEET 2 3 ...
Page 67: ...REV 02 OCT 2020 JLT4500 IOM F 67 12 3 WIRING DIAGRAM OF CONTROL BOXES SHEET 3 3 ...
Page 68: ...REV 02 OCT 2020 JLT4500 IOM F 68 12 4 WIRING DIAGRAM OF THE ELECTRICAL SYSTEM ...
Page 70: ...REV 02 OCT 2020 JLT4500 IOM F 70 13 FOUNDATION PLAN ...