REV 02 OCT 2020 JLT4500-IOM-F
19
Fig. 6, Route Idler Hose
9)
Route Idler Hose through Extension, see Fig.6.
10) Based on your LAYOUT, connect below parts/ sub-assembly together, see Fig.7.
Install the limit switch assembly onto cross member weldment (EAS2185T12A) with screws (M6x12, 1-02688A) & M6 nuts (1-15088A).
Fig.7, Overhead Breakdown
11) Assemble overhead sub-assembly (EAA0459T03A - 1) to idler column using only two of the mounting bolts and allow to pivot until it
rests on the idler column (use protection between painted components), see Fig.8.
Summary of Contents for JLT4500S
Page 3: ...REV 02 OCT 2020 JLT4500 IOM F 3 ...
Page 13: ...REV 02 OCT 2020 JLT4500 IOM F 13 Fig 3 General Specifications Service Bay Layout ...
Page 46: ...REV 02 OCT 2020 JLT4500 IOM F 46 9 1 PARTS BREAKDOWN OF FINAL ASSEMBLY Fig 38 FINAL ASSEMBLY ...
Page 54: ...REV 02 OCT 2020 JLT4500 IOM F 54 9 6 PARTS BREAKDOWN OF CARRIAGE AND ARMS ...
Page 64: ...REV 02 OCT 2020 JLT4500 IOM F 64 Check Report Summary Description Date and Name ...
Page 66: ...REV 02 OCT 2020 JLT4500 IOM F 66 12 2 WIRING DIAGRAM FOR SINGLE PHASE SHEET 2 3 ...
Page 67: ...REV 02 OCT 2020 JLT4500 IOM F 67 12 3 WIRING DIAGRAM OF CONTROL BOXES SHEET 3 3 ...
Page 68: ...REV 02 OCT 2020 JLT4500 IOM F 68 12 4 WIRING DIAGRAM OF THE ELECTRICAL SYSTEM ...
Page 70: ...REV 02 OCT 2020 JLT4500 IOM F 70 13 FOUNDATION PLAN ...