REV 02 OCT 2020 JLT4500-IOM-F
24
Fig.17, Column shimming
32) Hammer in the anchors until they make contact with the base plate. Hand tightens all anchor bolts. Check that the column is level. Adjust
shims as required.
33) Tighten all anchors (step 5 of
Fig. 15
) and recheck column for plumb. Re-shim if necessary. To set anchors, Torque anchors to:
If HILTI M16 mechanical anchors are used: initial torque = 80 N·m; After initial setting, re-torque to 110 N·m;
If FISCHER M16 mechanical anchors are used: install torque = 100 N·m;
If HILTI M16 chemical anchors are used: install torque =80 N·m;
DANGER
Verify that all the bolts are properly tightened before proceeding with the installation of the lift. It is prohibited to use or even test the
lift if only one of the dowels (anchors) has not been correctly positioned or if the tightening torque of all of them has not been verified.
34) Assemble overhead sheaves, spacers and washers onto the sheave pin as shown in
Fig.18
. Set in cradle with all assembly parts
between the two plates.
Fig. 18, Sheave Assembly
35) Route synchronizing cables.
Step 1,
Based on your LAYOUT and the MODEL you get, choose correct cable, choose a corresponding fixing plate (see
Table 4
/
Fig.19
) on one side carriage, to fix this end of the cable (Call
Cable 1
) according to the required configuration. Jam both end nuts
together and Hand tightens them
Table 1, Fixing position for steel cables in one side carriage
Model
Configuration
Cable PN
1st fixing plate
2nd fixing plate
JLT4500S-Low
Config.1
:H3950
EAM0138T07A
End of cable 2*
End of cable 1
JLT4500S-High
Config.3
:H4300
EAM0138T07A
End of cable 1
End of cable 2
JLT4500T-Low
Config.2
:H4600
EAM0138V99A
End of cable 2
End of cable 1
JLT4500T-High
Config.4
:H4950
EAM0138V99A
End of cable 1
End of cable 2
*The end of
Cable 2
, will comes from other side carriage
Summary of Contents for JLT4500S
Page 3: ...REV 02 OCT 2020 JLT4500 IOM F 3 ...
Page 13: ...REV 02 OCT 2020 JLT4500 IOM F 13 Fig 3 General Specifications Service Bay Layout ...
Page 46: ...REV 02 OCT 2020 JLT4500 IOM F 46 9 1 PARTS BREAKDOWN OF FINAL ASSEMBLY Fig 38 FINAL ASSEMBLY ...
Page 54: ...REV 02 OCT 2020 JLT4500 IOM F 54 9 6 PARTS BREAKDOWN OF CARRIAGE AND ARMS ...
Page 64: ...REV 02 OCT 2020 JLT4500 IOM F 64 Check Report Summary Description Date and Name ...
Page 66: ...REV 02 OCT 2020 JLT4500 IOM F 66 12 2 WIRING DIAGRAM FOR SINGLE PHASE SHEET 2 3 ...
Page 67: ...REV 02 OCT 2020 JLT4500 IOM F 67 12 3 WIRING DIAGRAM OF CONTROL BOXES SHEET 3 3 ...
Page 68: ...REV 02 OCT 2020 JLT4500 IOM F 68 12 4 WIRING DIAGRAM OF THE ELECTRICAL SYSTEM ...
Page 70: ...REV 02 OCT 2020 JLT4500 IOM F 70 13 FOUNDATION PLAN ...