SCREEN BLINDS
113
Assembly
Assembly works must be carried out solely by qualified personnel capable of adhering to all instructions stated below with
full consideration of their safety and that of all other persons.
The main activities include:
1) preparation of walls, ceilings, windows or other structures for the assembly of roller blinds while using portable drills
and screwdrivers;
2) roller blind assembly to a wall or ceiling;
3) connection to power mains;
4) adjustment (of end stops / end switches, etc.) and testing of the roller blind.
Preparation of roller blind assembly
Prior to installing the roller blind, check whether the surface of the assembly place is not damaged and if it is suitable for
assembly. Select suitable attachment screws (type and dimensions) corresponding to the type of structure onto which the
roller blind is to be installed (wood, cement, brick).
NOTE: Faulty assembly can lead to accidents. Observe instructions for the proper roller blind assembly to prevent the risk of
separation of the roller blind from a wall or window. ISOTRA a. s. shall not be held responsible for defects caused by faulty
assembly.
Roller blind assembly
The roller blind can be installed using two different methods:
1. direct assembly to guide bars, attached to a ceiling or wall;
2. assembly to a ceiling or frontal assembly using special attachment brackets.
Upper box assembly
The upper box consists of three parts: side board (1), fixed part (2) and removable part
(3). If it is necessary to remove the winding drum, the access to the upper box is possible
after removing two screws (4) – one on each side – and removing the removable part
of the box.
Direct assembly to guide bar
Insert the rectangular brass pin, projecting from the lower part of the side board,
into the guide bar, as shown in the picture. No screws are necessary.
SCREEN ZIP
Assembly
Summary of Contents for HRS-ZIP
Page 1: ...TECHNICAL MANUAL SCREEN BLINDS EN...
Page 3: ...SCREEN BLINDS 3 CE Product Marking...
Page 4: ...SCREEN BLINDS 4...