In addition to the safety measures indicated in this manual, the general measures that apply in this
area (specific to the installation, country, etc.) must be taken into account.
The electrical installation must not involve a risk of fire or explosion. Workers must be duly protected
against accident risks from direct or indirect contact. The electrical installation and protection devices
must take the voltage, the external determining factors and the competence of the people who have
access to parts of the installation into account.
All equipment must be appropriate to protect exposed workers against the risk of direct or indirect
contacts. In any case, the electrical parts of the work equipment must comply with that laid down in
the corresponding specific regulations.
All workers who carry out work outdoors must suspend their work in the case of storms, rain or strong
winds, snow or any other unfavourable environmental condition which makes visibility or handling
tools difficult. Work on installations directly connected to overhead electricity lines must be inter-
rupted in the case of storms.
Ingeteam accepts no liability for any damages caused by improper use of the equipment. Any work
carried out on any equipment which implies a modification of the original electrical arrangements
must be proposed in advance to Ingeteam. These must be studied and approved by Ingeteam.
The necessary means must be arranged to prevent people from outside the installation
approaching or handling the equipment:
•
Warning signs cautioning that there are people working.
•
Elements for setting or mechanical locking.
These instructions must be easily accessible close to the unit and located within reach of all users.
Before installation and start-up, read these safety instructions and warnings carefully as well as all the notices located
on the unit. Ensure that all the notices are perfectly legible and that those which are damaged or have disappeared
are restored.
4.3.1. Inspection tasks
May involve opening the housing for visual inspection tasks.
4.3.2. Control tasks
Tasks to load software from the communications connector.
4.3.3. Handling tasks
Tasks for the mounting and/or replacement of parts (fuses, switchgear in general, etc.), tasks for disconnecting and
reconnecting voltage, connecting the inverters to equipment and connecting communications cabling to the equip-
ment. All those tasks which are neither Inspection or Control will be considered to be Handling.
4.4. General
This section defines the preventive measures to take to carry out all types of tasks on the unit, working safely and
controlling risks which cannot be avoided.
Protection against direct contact is by means of the housing, which has IP65 protection class.
The unit has been tested according to the applicable regulations to comply with the safety requirements, the values
AAY2000IKI04
22
Installation manual
Ingeteam Power Technology, S.A.