126
TK 56218-2-OP-EN
Figure 146.
Loading Considerations
1.
Correct load height (trailers without chutes)
6.
Clear defrost drains
2.
Tight doors and seals
7.
Good outside air circulation
3.
Good air circulation around load
8.
Unit inspection
4.
Proper cargo temperature (
prior
to loading)
9.
Tight seals
5.
Interior/exterior walls and insulation in good
condition
10.
Maximum load height
followed
Post-Loading Inspection
Post-loading inspections verify the cargo has been loaded properly. To
perform a post-load inspection:
1. Inspect the evaporator outlets for blockage.
2. Turn the unit off before opening the cargo box doors to maintain efficient
operation.