Everest CORE - Product Manual |
Application Guide
INGENIA | 08/01/2019
51
Everest CORE can be interfaced by means of
5 power pins
(4 mm pitch) and
2 mezzanine connectors
(0.5 mm
pitch).
While the mezzanine headers can only be connected to its matching mating connectors, the power pins can either
be
directly soldered to the interface PCB
, or be
plugged into a receptacle mating contact
. The first approach
would allow Everest CORE to reach its specified nominal phase current, but it will not be possible to unplug it from
the interface board. On the other hand, the second approach will be limited to the rated current of the contacts, but
allowing the Everest CORE to be unplugged if required. Both strategies will require TH pads to hold the Everest
CORE, meaning that a full footprint for Everest CORE
requires mixed assembly technologies, both THT and SMT
.
7.3.1. Required files
To start with, you can download the files linked below: