2 - 43
<
Voltage input sensitivity test / monitoring output test
>
Connection of the instruments
The connections of cables between each instrument are as below.
Operate the performance check
1) Start up the K2/SINE.
2) Select the manual operation of K2/SINE.
Set conditions :
output [80Hz 500mV]
input type [Voltage input (AC)]
input sensitivity for Ch.1 [5mV/(m/s
2
)]
3) Set the mode of the voltmeter to AC voltage measurement.
4) Start the operation by K2.
5) Next, set the indicated value of the voltmeter to 353.5mV±0.5mV by adjusting the
drive voltage of K2. Record the value of the adjusted drive voltage to a check
sheet.
6) Record these items indicated on the display ;
(1) Connect [OUTPUT Ch1] to [INPUT Ch1] of the I/O UNIT by a BNC
cable.
(2) Connect [OUTPUT Ch1] to the voltmeter.
(3) Connect [IF IN] or [INTERFACE] at the rear panel of the I/O UNIT
to the personal computer.
To the personal computer
Input
Monitor
Output
Voltmeter
Voltmeter
Summary of Contents for K2-CE
Page 4: ......
Page 34: ...2 6 Step 2 The initial screen of installation appears Press the button of Next...
Page 38: ...2 10 Step 2 The initial screen of installation appears Press the button of Next...
Page 49: ...2 21 Step 2 The initial screen of installation appears Press the button of Next...
Page 55: ...2 27 Step 3 The screen displaying the message of Uninstall or change a program appears...
Page 58: ...2 30 Step 3 The screen displaying the message of Uninstall or change a program appears...
Page 81: ......
Page 82: ......
Page 92: ...4 3 4 2 2 Exit from Application 1 K2 Launcher Press the button Close on the screen...
Page 107: ...4 18 Step 3 A graph of the page displayed currently appears in the display...
Page 110: ...4 21 Step 3 Additional graph appears on the currently displayed page...
Page 121: ...4 32 Step3 Press the Mark button to mark the cursor data displayed in the list...
Page 141: ...4 52 Step 2 Press Yes when a dialog of message for assuring appears...
Page 149: ...4 60 Step 5 Press the OK button...
Page 170: ...4 81 Step 9 Press OK after completing of the necessary settings...
Page 172: ...4 83 Report of testing result generated by Report Generator...
Page 196: ...6 12 Step 3 Select desired data file Some files can be selected at a time...
Page 201: ...6 17 Step 3 Select desired data file Some files can be selected at a time...
Page 212: ...7 6 7 2 2 Standards Mode Procedures Step 1 Press the button of Standards...
Page 217: ...7 11 7 2 3 Test files mode Procedures Step 1 Press the button of Test files...