40
STHCkW ed 0409
HERCULES Condensing Export
Technical Documentation
Technical Documentation
Electric circuit.
Fase riscaldamento.
Operating with room thermostat.
By pressing the main button ( ) boiler activation is ena-
bled.
By using button (A) to select functioning in (Winter) func-
tioning is enabled in CH mode.
On closure of the room thermostat contact (S20) and if the
system pressure switch contact (S5) is closed (pressure detected
in the primary circuit higher than minimum value) the inte-
grated P.C.B. powers the pump (M1) by means of relay K2,
after which, by diversion of the K4 relay contact it powers the
motor (M) of the 3-way valve (M30). This functions until the
end run switch "1" opens when the CH position is reached.
This leads to the power supply of relay K1 positioned on the
pump relay board (A10) and the consequent power supply of
the CH pump (M2).
If the temperature detected by the NTC flow probe (B1) is
below the setting made on the control panel using the CH
temperature selector, the integrated P.C.B. powers the fan
(M20) and manages the speed.
With the consent of the safety thermostat (E4) and the flue
safety thermostat (E6) and the fan (M20) reaching the "validate
ignition" speed, the integrated P.C.B. allows to start the igni-
tion cycle by controlling, first the ignition electrodes (E1) by
means of the K7 igniter relay and then the K3 request relay,
both the coils of the gas valve (Y1).
The ignition of the burner is detected by the integrated P.C.B.
by means of the ionisation electrode (E2).
Operation with Remote Control.
In the case of connection to the CAR or Super CAR remote
control, the boiler automatically detects the device and the
(
) symbol appears on the display.
If the conditions detected by the Remote Control (CAR or
Super CAR) request ignition in CH mode (SUM/WINT selector
of the CAR in WINTER pos or Super CAR button working
(Winter), CH temperature adjustment higher than that detected
by the CH flow probe (B1), requested by the programmer clock,
room temperature adjustment higher than that detected)), the
integrated P.C.B. manages the burner ignition cycle as previ-
ously described.
N.B.
: By pressing the main switch ( ) and taking the boiler
into Stand-by, the CAR will show the "CON" connection error
symbol and the "ERR>CM" error will appear on the Super
CAR. The remote control is kept powered without losing the
memorised programs.
N.B.
: Every time switch off occurs when temperature is
reached, the integrated P.C.B. blocks burner functioning in
CH mode for a period of time equal to that set with board
parameters (see integrated P.C.B. functioning).
D
om
est
ic
ho
t w
ate
r
C
en
tra
l h
ea
tin
g
SAFETY EXTRA-LOW
VOLTAGE CIRCUIT
LOGIC
-CONTR
OLS MICR
OPR
OCESSOR
Super CAR remote
control (Optional)
SIGNAL
STATE
IMG BUS
link
Storage tank
function
jumper
RELAY BOARD (Optional)
Link for
VIRGILIO palmtop
Microprocessor
programming connector
CH ON
Summary of Contents for Hercules Condensing 26 2 E
Page 2: ......