E211101X_rev02_ENG
29/06/2022
12
ATTENTION!
As soon as the electric connection is made, check the suction fan correct working. In case the suction fan is
supplied with a 3-phase system, please check that the motor sense of rotation is correct and that the direction is
the one of the air exhausts. In case the motor fan is turning in the wrong direction, please change round two
supply phases.
ATTENTION!
In case the machine is gas heated, please check the correct position of phase and neutral in case of 1 phase
machines. The wrong connection causes the missing survey of the ionization sensor.
Ironer must be connected to an efficient ground system: the manufacturer declines any responsibility in case this
connection would not be complying with rules on matter.
Before any maintenance operation cut the electric supply to the machine: for maintenance refer to the ironer electric
diagram available in the pocket on the side door.
WARNING!
Even if the main switch is on “0”, cables before it has tension!
10.
GAS CONNECTIONS (only gas heated ironer)
Gas connection must be made by qualified technicians and in compliance with national and local rules in force. Please
check the supplied gas, it must correspond to the one indicated on the technical data labels stuck on the machine back.
Please check the correct position of the regulation ring (if existing). After that, close the side panels if still open, start
the machine and evaluate the pressure on the nozzle: use the following tables.
2500, 2800, 3200
Code
Gas Kind
Pressure at nozzle
Nozzle
Air intake position
O
G20
2E e 2H
12
440
no
R
G30 e GPL
3+ e 3B/P
27
290
no
For the supply system, please use an approved pipe: in case of a rigid pipe, it must be equipped with an expansion ring
For the gas supplying pipe dimensions, please refer to the attached technical data sheet: the external pipe system must
be adequate to the used kind of gas and in compliance with the rules of the country where the ironer is going to be
installed. Install a pressure reducer correctly dimensioned on the gas supply system and equipped the line with a valve
with manual closure system.
ATTENTION!
Gas valves are dimensioned for a pressure up to 55mbar. If the pressure is above this value, the valve
membranes could be broken. For this reason, a careful control of the pressure on the system before the machine
installation is compulsory.
ATTENTION!
If the pressure at the nozzles falls, it means that the gas system capacity is not enough. In this case, check if the
gas supply lines are o fan adequate size. Do not forget to take in consideration the line pressure falls because of
the line length.
Do not forget that adequate air inlets are necessary and that they must comply with the local and national rules in force
and that they must take in consideration the installed power and the suction fan capacity:
2500
2800
3200
Power [kW]
53
57
68
Suction capacity [m
3
/h]
350
350
350