328
IBM z13s Technical Guide
and control the zBX model 004. With the zBX model 004, the concept of owning the CPC
does not exist. Because the system upgrade is always disruptive, the zBX upgrade will also
be a disruptive task.
If installing a new build z13s server and planning to take over an existing zBX attached to
another existing CPC, and the zBX is not a model 004, the zBX conversion to a zBX model
004 can be done during the installation phase of the z13s server.
The following are some of the features and functions added by the zBX Model 004. Model 004
includes all of the enhancements implemented in zBX Model 003.
Stand-Alone node based zBX defined as an
ensemble member to the ensemble HMCs.
Direct management connection to server eliminated with node-based zBX Model 004.
Two SEs installed in the zBX Model 004.
Firmware updates and service activities are no longer linked to the z Systems CPC.
No need for a direct intranode management network (INMN) link between CPC and zBX.
Configuration and connectivity complexity is reduced and resiliency improved.
Synchronized time from HMC by using Network Time Protocol (NTP).
Workload Optimization mapped to SLA requirements available with zManager and zBX
Model 004.
Available only as an upgrade from zBX Model 002 and from a zBX Model 003.
No new blade types will be announced or delivered. As of December 31, 2014, all
supported Blades have been withdrawn from marketing (WDfM).
Except for DataPower XI50z Blades, supported x and p blades might still be available from
distributors or on the used market.
Empty slot entitlements for x and p blades, if already existing, can be populated.
New entitlements for blades were WDfM as of December 2015.
Consider upgrading zBX to a Model 004 until withdrawn (WDfM date not announced).
8.4 Permanent upgrade through the CIU facility
By using the CIU facility (through the IBM Resource Link on the web), you can start a
permanent upgrade for CPs, ICFs, zIIPs, IFLs, SAPs, or memory. When performed an
upgrade through the CIU facility, you add the resources yourself. IBM personnel do not have
to be present at your location. You can also unassign previously purchased CPs and IFL
processors through the CIU facility.
The capability to add permanent upgrades to a z13s server through the CIU facility requires
that the permanent upgrade enablement feature (FC 9898) be installed on the z13s server. A
permanent upgrade might change the MCI if additional CPs are requested or the change
capacity identifier is part of the permanent upgrade. However, it cannot change the z13s
model from an N10 to an N20. If necessary, more LPARs can be created concurrently to use
the newly added processors.
Planning: A permanent upgrade of processors can provide a physical concurrent upgrade,
resulting in more enabled processors available to a z13s configuration. Therefore,
additional planning and tasks are required for
nondisruptive
logical upgrades. See
“Suggestions to avoid disruptive upgrades” on page 353 for more information.
Summary of Contents for z13s
Page 2: ......
Page 3: ...International Technical Support Organization IBM z13s Technical Guide June 2016 SG24 8294 00 ...
Page 24: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 164: ...136 IBM z13s Technical Guide ...
Page 226: ...198 IBM z13s Technical Guide ...
Page 256: ...228 IBM z13s Technical Guide ...
Page 414: ...386 IBM z13s Technical Guide ...
Page 464: ...436 IBM z13s Technical Guide ...
Page 476: ...448 IBM z13s Technical Guide ...
Page 498: ...470 IBM z13s Technical Guide ...
Page 502: ...474 IBM z13s Technical Guide ...
Page 568: ...540 IBM z13s Technical Guide ...
Page 578: ...550 IBM z13s Technical Guide ...
Page 584: ...556 IBM z13s Technical Guide ...
Page 585: ...ISBN 0738441678 SG24 8294 00 1 0 spine 0 875 1 498 460 788 pages IBM z13s Technical Guide ...
Page 586: ......
Page 587: ......
Page 588: ...ibm com redbooks Printed in U S A Back cover ISBN 0738441678 SG24 8294 00 ...