Table
3-5 (Page 3 of 10). Firmware Checkpoints.
Checkpoint
Description
Action/
Possible Failing FRU
E138
Create options node
See the note on 3-30.
E139
Create aliases node and system
aliases
See the note on 3-30.
E13A
Create packages node
See the note on 3-30.
E140
PReP style load
See the note on 3-30.
E149
Create boot mgr node
See the note on 3-30.
E14C
Create terminal-emulator node
See the note on 3-30.
E14D
Load boot image
See “E1xx Code Boot Problems” on
page 3-46.
E14E
Create client interface
node/directory
See the note on 3-30.
E14F
NVRAM validation, config variable
token generation
See the note on 3-30.
E150
Create host (primary) PCI controller
node
See the note on 3-30.
E151
Probing primary PCI bus
1. PCI Adapters
2. I/O board.
If a network adapter or I\O board is
replaced, see 3-1.
See the note on 3-30.
E152
Probe for adapter FCODE, evaluate
if present
1. PCI Adapters
2. I/O board.
If a network adapter or I\O board is
replaced, see 3-1.
See the note on 3-30.
E153
End adapter FCODE,
probe/evaluation
See the note on 3-30.
E154
Create PCI bridge node
See the note on 3-30.
E155
Probe PCI bridge secondary bus
1. PCI Adapters
2. I/O board.
If a network adapter or I\O board is
replaced, see 3-1.
See the note on 3-30.
E156
Create PCI ethernet node
See the note on 3-30.
E15A
Create 64 bit host (primary) PCI
controller node
See the note on 3-30.
E15B
Transferring control to Operating
System (service mode boot)
See “E1xx Code Boot Problems” on
page 3-46.
Chapter 3. Error Code to FRU Index
3-35
Summary of Contents for RS/6000 H50
Page 1: ...RS 6000 Enterprise Server Model H50 IBM Installation and Service Guide SA38 0547 00...
Page 16: ...xvi RS 6000 Enterprise Server Model H50 Installation and Service Guide...
Page 30: ...1 12 RS 6000 Enterprise Server Model H50 Installation and Service Guide...
Page 131: ...Chapter 3 Error Code to FRU Index 3 51...
Page 160: ...5 18 RS 6000 Enterprise Server Model H50 Installation and Service Guide...
Page 245: ...Chapter 8 Parts Information Chapter 8 Parts Information 8 1...
Page 290: ...B 4 RS 6000 Enterprise Server Model H50 Installation and Service Guide...
Page 305: ...expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done Appendix C Modem Configurations C 15...
Page 312: ...C 22 RS 6000 Enterprise Server Model H50 Installation and Service Guide...
Page 316: ...D 4 RS 6000 Enterprise Server Model H50 Installation and Service Guide...
Page 324: ...X 8 RS 6000 Enterprise Server Model H50 Installation and Service Guide...
Page 326: ...X 10 RS 6000 Enterprise Server Model H50 Installation and Service Guide...