Firmware Checkpoints
Firmware uses progress codes (checkpoints) in the range of E1xx to EFFF. These
checkpoints occur during system startup and maybe be useful in diagnosing certain
problems. Service Processor checkpoints are listed in “SP Checkpoints” on
page 3-30.
If you replace FRUs and the problem is still not corrected, go to “MAP 1540:
Minimum Configuration” on page 2-25 unless otherwise indicated in the tables.
Table
3-4 (Page 3 of 3). SP Checkpoints.
Checkpoint
Description
Action/
Possible Failing FRU
E0A0
Beginning Bring-Up Phase
1. Service Processor.
2. I/O board. (See notes on 3-1.)
3. CPU Card.
E0B0
Starting CPU BIST
1. CPU Card.
2. I/O board. (See notes on 3-1.)
3. Service Processor.
E0C0
Starting X5 BIST
1. CPU Card.
2. I/O board. (See notes on 3-1.)
3. Service Processor.
E0E0
Pulling CPU out of reset
1. CPU Card.
2. I/O board. (See notes on 3-1.)
3. Service Processor.
E0E1
Pull CPU out of reset: okay
1. CPU Card.
2. I/O board. (See notes on 3-1.)
3. System board.
4. Service Processor.
E0E2
Check point for "Hot-Swap" fans
and power supply.
Power supply hot-swap is in
progress. Fans and power supply
must be replaced within 5 minutes.
After 5 minutes the service
processor initiates a fast shutdown
of the system.
OK
SP Ready Waiting for Power-On
None. Normal operation.
STBY
SP Ready. System was shutdown
by the operating system and is still
powered on.
This condition can be requested by
a privileged system user with no
faults. See SP error log for pos-
sible operating system fault indi-
cations.
3-32
RS/6000 Enterprise Server Model H50 Installation and Service Guide
Summary of Contents for RS/6000 H50
Page 1: ...RS 6000 Enterprise Server Model H50 IBM Installation and Service Guide SA38 0547 00...
Page 16: ...xvi RS 6000 Enterprise Server Model H50 Installation and Service Guide...
Page 30: ...1 12 RS 6000 Enterprise Server Model H50 Installation and Service Guide...
Page 131: ...Chapter 3 Error Code to FRU Index 3 51...
Page 160: ...5 18 RS 6000 Enterprise Server Model H50 Installation and Service Guide...
Page 245: ...Chapter 8 Parts Information Chapter 8 Parts Information 8 1...
Page 290: ...B 4 RS 6000 Enterprise Server Model H50 Installation and Service Guide...
Page 305: ...expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done Appendix C Modem Configurations C 15...
Page 312: ...C 22 RS 6000 Enterprise Server Model H50 Installation and Service Guide...
Page 316: ...D 4 RS 6000 Enterprise Server Model H50 Installation and Service Guide...
Page 324: ...X 8 RS 6000 Enterprise Server Model H50 Installation and Service Guide...
Page 326: ...X 10 RS 6000 Enterprise Server Model H50 Installation and Service Guide...