Noise
Emissions
³
Operating
Idle
With
H80
and
Primary
I/O
Drawer
L
WAd
6.2
bels
6.2
bels
L
pAm
N/A
N/A
<L
pA
>
m
48
dBA
48
dBA
Impulsive
or
prominent
discrete
tones
No
No
Install/Air
Flow
Clearance
Maintenance
of
proper
service
clearances
should
allow
proper
air
flow.
Service
Clearance
(See
service
clearances
for
the
7014
T00
Rack)
1.
Inrush
currents
occur
only
at
initial
application
of
power,
no
inrush
occurs
during
normal
power
off-on
cycle.
2.
For
altitudes
above
915
meters,
the
maximum
temperature
limit
is
derated
by
1
degree
C
for
every
137
meters
of
elevation
above
915
meters.
3.
See
“Noise
Emission
Notes”
on
page
64
for
definitions
of
noise
emissions
positions.
Chapter
1.
Reference
Information
59
Summary of Contents for 6H0
Page 2: ......
Page 12: ...x Service Guide ...
Page 16: ...xiv Service Guide ...
Page 18: ...xvi Service Guide ...
Page 28: ...R CEC Drawer 5 EIA Units Primary I O Drawer 5 EIA Units 8 Service Guide ...
Page 29: ...CEC Drawer Front View 1 1 Power On LED Chapter 1 Reference Information 9 ...
Page 33: ...5 Fan 4 U0 1 F4 6 Fan 3 U0 1 F3 Chapter 1 Reference Information 13 ...
Page 37: ...5 Fan 4 U0 2 F4 6 Fan 3 U0 2 F3 Chapter 1 Reference Information 17 ...
Page 77: ...DC Power Cable Routings Chapter 1 Reference Information 57 ...
Page 88: ...68 Service Guide ...
Page 94: ...74 Service Guide ...
Page 182: ...162 Service Guide ...
Page 444: ...424 Service Guide ...
Page 468: ...Replacement Replace in reverse order 448 Service Guide ...
Page 489: ...Chapter 10 Parts Information This chapter contains parts information for the system 469 ...
Page 490: ...CEC Drawer 1 2 3 4 9 10 12 11 7 8 6 5 14 14 13 15 16 17 18 18 19 20 470 Service Guide ...
Page 493: ...1 2 3 4 5 6 7 8 9 10 11 Chapter 10 Parts Information 473 ...
Page 497: ...7 8 9 10 6 1 2 3 4 4 5 Chapter 10 Parts Information 477 ...
Page 510: ...490 Service Guide ...
Page 522: ...502 Service Guide ...
Page 546: ...526 Service Guide ...
Page 552: ...532 Service Guide ...
Page 559: ......