Table
2.
Firmware
Checkpoints
(continued)
Checkpoint
Description
Action/
Possible
Failing
FRU
E604
SSA
PCI
adapter
BIST
and
subsequent
POSTs
have
completed
successfully.
Replace
the
adapter.
See
“Checkpoint
and
Error
Code
Index”
on
page
165
for
location
code
information
related
to
this
error.
E605
SSA
PCI
adapter
BIST
has
completed
successfully
but
the
subsequent
POSTs
have
failed.
Replace
the
adapter.
See
“Checkpoint
and
Error
Code
Index”
on
page
165
for
location
code
information
related
to
this
error.
E60E
SSA
PCI
adapter
open
firmware
about
to
exit
(no
stack
corruption).
Replace
the
adapter.
See
“Checkpoint
and
Error
Code
Index”
on
page
165
for
location
code
information
related
to
this
error.
E60F
SSA
PCI
adapter
open
firmware
has
run
unsuccessfully.
Replace
the
adapter.
See
“Checkpoint
and
Error
Code
Index”
on
page
165
for
location
code
information
related
to
this
error.
E6FF
SSA
PCI
adapter
open
firmware
about
to
exit
(with
stack
corruption).
Replace
the
adapter.
See
“Checkpoint
and
Error
Code
Index”
on
page
165
for
location
code
information
related
to
this
error.
E700
Create
system
firmware
VPD
Replace
the
primary
I/O
drawer
backplane,
location:
U0.1–P1.
E701
Create
memory
VPD.
Go
to
“MAP
1540:
Minimum
Configuration”
on
page
113
to
isolate
the
failing
memory
components.
E702
Create
processor
card
VPD.
Replace
the
processor
card,
location:
U1.1–P1–C1.
See
the
note
on
page
139.
E703
Create
operator
panel
VPD.
1.
Replace
the
operator
panel,
location
U0.1–L1.
See
“Replacing
the
Primary
Drawer
Operator
Panel”
on
page
163.
2.
Replace
the
primary
I/O
drawer
backplane,
location:
U0.1–P1.
E704
Create
CEC
VPD.
See
the
note
on
page
139.
E705
Create
clock
card
VPD.
See
the
note
on
page
139.
E706
Create
RIO
extender
card
VPD.
Replace
RIO
extender
card.
See
the
note
on
page
139.
E707
Create
system
VPD.
See
the
note
on
page
139.
E708
Create
RIO
to
PCI
adapter
VPD.
See
the
note
on
page
139.
E709
Create
VPD
via
SPCN.
See
the
note
on
page
139.
E70A
Create
service
processor
VPD.
Replace
the
primary
I/O
drawer
backplane,
location:
U0.1–P1.
Chapter
4.
Checkpoints
157
Summary of Contents for 6H0
Page 2: ......
Page 12: ...x Service Guide ...
Page 16: ...xiv Service Guide ...
Page 18: ...xvi Service Guide ...
Page 28: ...R CEC Drawer 5 EIA Units Primary I O Drawer 5 EIA Units 8 Service Guide ...
Page 29: ...CEC Drawer Front View 1 1 Power On LED Chapter 1 Reference Information 9 ...
Page 33: ...5 Fan 4 U0 1 F4 6 Fan 3 U0 1 F3 Chapter 1 Reference Information 13 ...
Page 37: ...5 Fan 4 U0 2 F4 6 Fan 3 U0 2 F3 Chapter 1 Reference Information 17 ...
Page 77: ...DC Power Cable Routings Chapter 1 Reference Information 57 ...
Page 88: ...68 Service Guide ...
Page 94: ...74 Service Guide ...
Page 182: ...162 Service Guide ...
Page 444: ...424 Service Guide ...
Page 468: ...Replacement Replace in reverse order 448 Service Guide ...
Page 489: ...Chapter 10 Parts Information This chapter contains parts information for the system 469 ...
Page 490: ...CEC Drawer 1 2 3 4 9 10 12 11 7 8 6 5 14 14 13 15 16 17 18 18 19 20 470 Service Guide ...
Page 493: ...1 2 3 4 5 6 7 8 9 10 11 Chapter 10 Parts Information 473 ...
Page 497: ...7 8 9 10 6 1 2 3 4 4 5 Chapter 10 Parts Information 477 ...
Page 510: ...490 Service Guide ...
Page 522: ...502 Service Guide ...
Page 546: ...526 Service Guide ...
Page 552: ...532 Service Guide ...
Page 559: ......