![IAI ssel Operation Manual Download Page 46](http://html1.mh-extra.com/html/iai/ssel/ssel_operation-manual_604058046.webp)
21
Part 1 Installation
[16] Axis 2 encoder/sensor
connector:
This connector is used to connect the encoder/sensor cables for axis 2.
[17] Axis 1 absolute-data backup
battery connector:
This connector is used to connect the absolute-data backup battery for
axis 1. (This connector is required only when the actuator is of absolute
encoder specification.)
[18] Axis 2 absolute-data backup
battery connector:
This connector is used to connect the absolute-data backup battery for
axis 2. (This connector is required only when the actuator is of absolute
encoder specification.)
Summary of Contents for ssel
Page 1: ...Operation Manual Eighth Edition SSEL Controller ...
Page 26: ......
Page 50: ...25 Part 1 Installation 3 Specification with system memory backup battery optional ...
Page 385: ...359 ...
Page 495: ......
Page 496: ......