4.2.2. Push both plastic locking sleeves towards the Primary element rail ends
ensuring the IAE logo is at 12 o
’
clock, then slide the fishplates through the
slot located directly below each rail in the brace. See Fig 21
Fig 22
11
4.2.1. Slide the plastic locking sleeves (supplied with the Primary element) along the top and
bottom rail of the Insert element, leaving to sit loosely. Offer the Insert element up to the Primary
element, begin to insert by pushing the longer top and bottom rails into the Primary rails see Fig 20,
followed by the intermediate rails. Now determine the combined gate length to suit your opening,
remembering to leave enough slam clearance for the spring bolts and receivers to be assembled
subsequently (refer to
4.3. Spring Bolt Assembly
on pages 12
-
13).
4.2. Insert Element Hanging Guide
IMPORTANT
:
Insert requires minimum 305mm insertion
into Primary.
POLICY FOR HANGING INSERTS:
The same methodology is used for
inserting all insert panel variants available
in the AG
-
fit
range.
MAINTENANCE INFO:
Take care when sliding the gate elements
together so as to preserve the protective
nature of the galvanised finish.
Fig 20
Fig 21
1001270
Volume 3.1
Issue Date: March 2021