4.2.3. To fix the combined gate length and lock
the Primary to Insert, fasten the fishplates in
place using grub screws, the plastic locking
sleeves have a hole to locate the grub screw but
for fastening to the intermediate rails tighten up
the grub screw to pinch the underside of the rail
using 5mm Allen key. See Fig 22
4.3.1. A separate fittings kit contains components for the spring bolt assembly. Begin to build
by inserting the washer, compression spring and end cap (in the order shown below) into the
top and bottom spring bolt cage. See Fig 24
4.2.4. Fit blue plastic inserts into the top and
bottom of the Insert element slam stile.
See Fig 23
12
Fig 22
TORQUE SETTINGS
:
25Nm
for all 5 rails
Fig 23
TOOLS REQUIRED:
Ø19mm Open end spanner
Hammer
4.3. Spring Bolt Assembly
Fig 24
1001270
Volume 3.1
Issue Date: March 2021