G1E Programming Manual
41
Connecting Stations
The station cabling for the G1E should be a home run from the jack to the telephone room. The
termination should be at conventional 66 type connecting blocks or Krone blocks or directly to the
provided station connectors. One pair twisted wiring is required for each station location. The G1E
station ports are not digital twin ports and each station must be a home run to either the inner or outer
pair of each DDK connector. Attention to proper cabling will go a long way towards a successful
installation and minimizing service calls after installation. Some guidelines for running station cable are
as follows:
z
Avoid running cable parallel to fluorescent light fixtures or electrical lines not in conduit. If these
obstacles are unavoidable, run the cable at right angles across them.
z
Do not run station cable inside conduit already occupied by electrical wiring.
z
Do not run station cable near equipment with electric motors or strong magnetic fields.
z
Do not place station cable on the ground where it can be stepped on or rolled over by office
furniture or office equipment.
Summary of Contents for G1E
Page 16: ...Issue 3 3 2 April 2011 ...
Page 26: ......
Page 30: ...14 Issue 3 3 2 April 2011 G1E Main Equipment with MSC VMC 2 TKU s 2 STU s Installed ...
Page 31: ...G1E Programming Manual 15 G1E Main Equipment ...
Page 69: ...G1E Programming Manual 53 PROGRAMMING INFORMATION ...
Page 74: ...58 Issue 3 3 2 April 2011 ...
Page 75: ...G1E Programming Manual 59 PROGRAM MODES ...
Page 117: ...G1E Programming Manual 101 07 Reserved 08 Reserved ...
Page 119: ...G1E Programming Manual 103 07 Reserved 08 Reserved ...
Page 121: ...G1E Programming Manual 105 07 Reserved 08 Reserved ...
Page 127: ...G1E Programming Manual 111 ...
Page 169: ...G1E Programming Manual 153 ...
Page 171: ...G1E Programming Manual 155 05 Reserved 06 Reserved 07 Reserved 08 Reserved ...
Page 218: ......