32
Issue 3.3.2 / April, 2011
Install G1-RGU- Ring Generator Unit
Power down the system before installation
Fasten the G1E-RGU in position using the 4 supplied screws
Connect the G1-RGU CN1 to the G1E-PWU CN2 using the supplied cable
Note: The G1-RGU must be installed before installing any G1E-SLU cards.
Current G1E+ Stock has RGU as standard.
Make certain that the cable is pushed home firmly into the connector
Install G1E+-RPC Remote Programming Card To G1E+ MBU2
The RPC card will only be able to be fitted to second generation G1E+ MBU’s
Summary of Contents for G1E
Page 16: ...Issue 3 3 2 April 2011 ...
Page 26: ......
Page 30: ...14 Issue 3 3 2 April 2011 G1E Main Equipment with MSC VMC 2 TKU s 2 STU s Installed ...
Page 31: ...G1E Programming Manual 15 G1E Main Equipment ...
Page 69: ...G1E Programming Manual 53 PROGRAMMING INFORMATION ...
Page 74: ...58 Issue 3 3 2 April 2011 ...
Page 75: ...G1E Programming Manual 59 PROGRAM MODES ...
Page 117: ...G1E Programming Manual 101 07 Reserved 08 Reserved ...
Page 119: ...G1E Programming Manual 103 07 Reserved 08 Reserved ...
Page 121: ...G1E Programming Manual 105 07 Reserved 08 Reserved ...
Page 127: ...G1E Programming Manual 111 ...
Page 169: ...G1E Programming Manual 153 ...
Page 171: ...G1E Programming Manual 155 05 Reserved 06 Reserved 07 Reserved 08 Reserved ...
Page 218: ......