16
Issue 3.3.2 / April, 2011
Site Requirements
Location
Choosing the Right Environment
•
System should be installed in a clean, dry, secure location. This location must have adequate
ventilation, and a temperature from 0
℃
to 30
℃
(32
℉
to 86
℉
), with 10% to 95% non-condensing
relative humidity. DO NOT install the equipment near sources of static electricity, excessive
vibration, or water. Avoid direct sunlight.
Installation Checklist
INSTALLATION REQUIREMENTS
VERIFICATION
MOUNTING SURFACE
Flat surface with adequate space for main cabinet,
power supply, wiring and optional Battery Backup
cabinet.
AC LINE
AC line should be dedicated exclusively to the system.
POWER OUTLET
Power Outlet must be a 3-wire grounded outlet plug.
The socket outlet shall be installed near the system and
be easily accessible.
Input power Line capacity requirements - 10 amperes.
CAUTION DOUBLE POLE/NEUTRAL FUSING ON
EUROPEAN PLUGS
SURGE PROTECTION
A Surge Protector is recommended on the dedicated
AC line.
VENTILATION AND TEMPERATURE
Humidity: 10% to 95% relative non-condensing
Temperature:32
℉
to 113
℉
(0
℃
to 45
℃
).
EARTH GROUND
A proper ground connection. (14 AWG)
SERVICEABILITY
Lighting conditions and working space adequate for
future service.
Equipment Requirements
•
Unpack, Check and Verify Equipment - Unpack the telephone equipment boxes and verify the
contents in accordance with the packing list provided. If any discrepancies are noticed, please
contact Auto Telecom or Authorized Dealers.
•
Damaged Boxes - If you notice any damage to the packages, please notify both the shipper and
Auto Telecom or Authorized Dealers at once.
•
List of parts included in basic KSU box:
•
KSU Main Cabinet
•
Mounting
Template
•
Mounting
Screws
•
Station Quick Connectors
•
Spare
Fuses
•
Cable
Cover
•
User
guide
Summary of Contents for G1E
Page 16: ...Issue 3 3 2 April 2011 ...
Page 26: ......
Page 30: ...14 Issue 3 3 2 April 2011 G1E Main Equipment with MSC VMC 2 TKU s 2 STU s Installed ...
Page 31: ...G1E Programming Manual 15 G1E Main Equipment ...
Page 69: ...G1E Programming Manual 53 PROGRAMMING INFORMATION ...
Page 74: ...58 Issue 3 3 2 April 2011 ...
Page 75: ...G1E Programming Manual 59 PROGRAM MODES ...
Page 117: ...G1E Programming Manual 101 07 Reserved 08 Reserved ...
Page 119: ...G1E Programming Manual 103 07 Reserved 08 Reserved ...
Page 121: ...G1E Programming Manual 105 07 Reserved 08 Reserved ...
Page 127: ...G1E Programming Manual 111 ...
Page 169: ...G1E Programming Manual 153 ...
Page 171: ...G1E Programming Manual 155 05 Reserved 06 Reserved 07 Reserved 08 Reserved ...
Page 218: ......