32
2 Connection coolant hose
3 mounting box
1 Vice with hand wheel
2. moving forward guide with protective
3. Clamping screw front
4.Screw band voltage
5. Control panel with emergency stop switch
6. feed regulator
7. Average initial recognition
1
2.1 cooling lubrication
Cutting oil and water in the proportion 1:10, 1:15, or in accordance with the
Manufacturer's instructions of the product mix carefully (the container Liters).
Pour the cooling water in the rear tank.
Check real-tightness of the coolant pump and the cooling medium holder same
12.2 Power supply
It is important to ensure that the voltage and line frequency on the
Nameplate information listed correspond (on the side of the control panel).
Deviations above 10% lead to more or less distinct Irregularities in operation.
The supplied connector to a suitable power outlet (if this needs to be replaced, this
work must by authorized personnel e.g. Be performed electrician). Carried out by
Summary of Contents for HU 300 HAC-4 Topline
Page 1: ...HU 300 HAC 4 Topline METAL CUTTING BAND SAW MACHINE INSTRUCTION MANUAL 0...
Page 5: ...4 A GENERAL Indentation MODEL HU 300 HAC 4 TOPLINE...
Page 52: ...51 Overview Lubricant...
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ...69...
Page 72: ...78...
Page 73: ...77...
Page 74: ...76...
Page 75: ...75...
Page 76: ...74...
Page 77: ...73...
Page 78: ...72...
Page 79: ...71...
Page 80: ...70...
Page 85: ...CHANGES AND TYPING ERRORS RESERVED...
Page 86: ...24 CHANGES AND TYPING ERRORS RESERVED 2018 V1...