- Attach a clear plastic hose to the bleed valve (1) on the caliper
and turn the other end of the hose into a container.
- Depress the pedal (2) and keep it full down.
- Loosen the bleed union letting out fluid (at first, only air will
come out), then, closing the union slightly.
- Release the pedal and wait for a few seconds before repeating
the operation until only fluid come out of the tube.
- Close the bleed union to the prescribed torque and check the
fluid level (B) inside the reservoir before reassemblle the cap
(1).
If the bleeding operation has be done correctly, the pedal will
have no mushy feel. If not, repeat the operation.
NOTE
Should the motorcycle, due to a fall during a competition or shop
repairs, show some elasticity of the brake lever stroke, with a
subsequent braking efficiency decrease, you'll to repeat the cir-
cuit bleeding as above described.
WARNING!
During the bleed operation the fluid level
inside the reservoir must never be lower
than the minimum level.
Tightening torque for bleed valve is 1,2 ÷
1,6 kgm (12 ÷ 16 Nm; 8.8 ÷ 11.8 ft-lb).
64
TC
SMR
1
MUM2-250_310_450_510_2009_GB 21-05-2008 9:38 Pagina 64
Summary of Contents for 2009 SMR 450
Page 83: ...IT 81 MUM2 250_310_450_510_2009 21 05 2008 11 22 Pagina 81 ...
Page 85: ...IT 83 DOTAZIONE MUM2 250_310_450_510_2009 21 05 2008 11 22 Pagina 83 ...
Page 87: ...IT 85 PARTI OPTIONAL MUM2 250_310_450_510_2009 21 05 2008 11 22 Pagina 85 ...
Page 93: ...1 ENGLISH MUM1 250_310_450_510_2009_GB 21 05 2008 9 27 Pagina 1 ...
Page 173: ...81 EN MUM2 250_310_450_510_2009_GB 21 05 2008 9 39 Pagina 81 ...
Page 175: ...83 EQUIPMENT EN MUM2 250_310_450_510_2009_GB 21 05 2008 9 39 Pagina 83 ...
Page 177: ...85 OPTIONAL PARTS EN MUM2 250_310_450_510_2009_GB 21 05 2008 9 59 Pagina 85 ...
Page 187: ...1 FRANÇAIS MUM1 250_310_450_510_2009 FR 21 05 2008 14 42 Pagina 1 ...
Page 267: ...81 FR MUM2 250_310_450_510_2009_FR 21 05 2008 12 30 Pagina 81 ...
Page 269: ...83 EQUIPEMENT FR MUM2 250_310_450_510_2009_FR 21 05 2008 12 30 Pagina 83 ...
Page 271: ...85 ELEMENTS EN OPTION FR MUM2 250_310_450_510_2009_FR 21 05 2008 12 31 Pagina 85 ...
Page 277: ...1 DEUTSCH MUM1 250_310_450_510_2009_DE 21 05 2008 8 55 Pagina 1 ...
Page 357: ...DE 81 MUM2 250_310_450_510_2009_DE 21 05 2008 9 15 Pagina 81 ...
Page 359: ...DE 83 AUSRüSTUNG MUM2 250_310_450_510_2009_DE 21 05 2008 9 15 Pagina 83 ...
Page 361: ...DE 85 EXTRA TEILE MUM2 250_310_450_510_2009_DE 21 05 2008 9 15 Pagina 85 ...
Page 367: ...1 ESPAÑOL MUM1 250_310_450_510_2009_ES 21 05 2008 12 04 Pagina 1 ...
Page 447: ...81 ES MUM2 250_310_450_510_2009_ES 21 05 2008 12 16 Pagina 81 ...
Page 449: ...83 EQUIPAMIENTO ES MUM2 250_310_450_510_2009_ES 21 05 2008 12 16 Pagina 83 ...
Page 451: ...85 PARTES OPCIONALES ES MUM2 250_310_450_510_2009_ES 21 05 2008 12 16 Pagina 85 ...
Page 470: ...A14 MEMORANDUM Appendice_A_2009 21 05 2008 11 04 Pagina A14 ...
Page 471: ...A15 A MEMORANDUM Appendice_A_2009 21 05 2008 11 04 Pagina A15 ...
Page 472: ...A16 MEMORANDUM Appendice_A_2009 21 05 2008 11 04 Pagina A16 ...
Page 473: ...A17 A MEMORANDUM Appendice_A_2009 21 05 2008 11 04 Pagina A17 ...
Page 474: ...A18 MEMORANDUM Appendice_A_2009 21 05 2008 11 04 Pagina A18 ...