INSTALLATION
35
■
Gently twist the fabric hanger outward and insert the LEFT side of the fabric hanger into the
carrier in the FRONT channel (see No. 3).
IMPORTANT:
After you have installed the first panel, verify that the flush end cap on the
bottom weight is on the LEFT side. The flat side of the bottom weight should face the room.
■
Continue installing panels, rear channel first. The last panel you will install will be marked
“FRONT PANEL — INSTALL LAST.”
IMPORTANT:
This panel has two flush end caps on the bottom weight.
■
Test traverse (use the button on the receiver).
Split Stack/Right Facing (Motor on the Right only)
IMPORTANT:
Use the button on the receiver to traverse the unit open and closed to test for
proper operation.
■
Use the button on the receiver to traverse the carriers to the stacked position.
■
Manually stack the half of the free carriers in the front channel to the left end and the other
half to the right end. Reposition these carriers as needed while installing each panel.
■
Locate the panel (you had previously set aside) marked “REAR PANEL — INSTALL FIRST.”
This is the first panel to install.
■
Locate the temporary plastic fabric hanger installed in the headrail. You will install the first
panel into the same carriers. Remember the carriers into which the hanger is installed,
remove the temporary hanger. Twist it gently to remove.
Flush End Cap
Window
Room
Headrail (Top View)
Left Stack/Left Facing
Bottom Weight
Summary of Contents for Skyline PowerView
Page 1: ...Installation Operation Care Skyline Gliding Window Panels PowerView Motorization...
Page 58: ...Notes...
Page 59: ......