INSTALLATION
16
Outside Mount Applications
Installation Bracket Placement
■
Measure and mark the wall 2" to 4" in from each end of the headrail.
■
Evenly space and mark the intermediate installation brackets at 18" to 24" intervals along
the headrail. DO NOT exceed 24" between installation brackets.
CAUTION:
The installation brackets must be mounted level to a flat, vertical surface for
the unit to operate correctly. Do not mount installation brackets on curved molding.
IMPORTANT:
If your unit came with a spliced headrail, see “Spliced Headrails without
Fabric-Wrapped Large Cassette” on page 24.
IMPORTANT:
The top of the installation brackets need to be mounted at the outside
mount ordered height plus an additional ½", for the desired floor clearance.
■
Use a
3
∕
32
" drill bit to drill the screw holes.
CAUTION:
Do not mount into drywall, only
mount into wood.
■
Attach each installation bracket to the
mounting surface using two screws.
■
Verify that the installation brackets are
mounted level and aligned with each other.
Attach the Installation Bracket Covers
IMPORTANT:
Bracket covers are optional and do not have to be installed.
■
Position the cover centered beneath the installation bracket.
■
Slide the cover up as far as possible.
■
Push against the cover to clip it onto the base of the installation bracket.
The cover will snap over the installation bracket base in two locations
(against the back and at the top).
Proceed to “Mount the Headrail” on page 23.
2"-4"
18"-24"
2"-4"
18"-24"
18"-24"
Wall
End of Headrail Mark
Mounting Clip
A 2" minimum flat
vertical surface
is required to
mount the brackets.
2" – 4"
End of
Headrail
Mark
Summary of Contents for Skyline PowerView
Page 1: ...Installation Operation Care Skyline Gliding Window Panels PowerView Motorization...
Page 58: ...Notes...
Page 59: ......