INSTALLATION
20
■
Remove the mounting clips and drill the
holes in the dust cover.
■
Hold the box valance in place on the
mounting surface and mark through
the holes.
■
Set the box valance aside.
■
Use a
3
∕
32
" drill bit to drill the screw holes.
CAUTION:
Do not mount into drywall,
only mount into wood.
■
Holding the box valance in place, install a
mounting clip and screw. For box valances
with more than two mounting clips, start
near the center.
IMPORTANT:
The release tab on all mounting clips
must face the same direction.
■
Install the rest of the mounting clips and screws.
Proceed to “Mount the Headrail” on page 23.
Release Tab
Mounting
Clip
Summary of Contents for Skyline PowerView
Page 1: ...Installation Operation Care Skyline Gliding Window Panels PowerView Motorization...
Page 58: ...Notes...
Page 59: ......