4.2.7 Installing Power Supply and Distribution Devices............................................................................................... 157
4.2.7.1 Installing Lithium Batteries...................................................................................................................................... 157
4.2.7.2 Installing a PDU2000..................................................................................................................................................158
4.2.7.3 (Optional) Installing an ATS Subrack................................................................................................................... 162
4.2.8 (Optional) Installing Cable Troughs......................................................................................................................... 163
4.2.8.1 Removing a Binding Plate........................................................................................................................................ 163
4.2.8.2 Installing a 600 mm Wide Cable Trough.............................................................................................................164
4.2.8.3 (Optional) Installing an 800 mm Wide Cable Trough.................................................................................... 168
4.2.9 Installing Monitoring Devices..................................................................................................................................... 168
4.2.9.1 Installing the SIM Card and Antenna................................................................................................................... 168
4.2.9.2 Installing a PAD............................................................................................................................................................ 169
4.2.9.3 (Optional) Installing a LAN Switch....................................................................................................................... 172
4.2.9.4 Installing T/H Sensors and Aisle Temperature Sensors (02312PBL)..........................................................173
4.2.9.4.1 Layout of T/H Sensors and Temperature Sensors.........................................................................................173
4.2.9.4.2 Installing T/H Sensors.............................................................................................................................................175
4.2.9.4.3 (Optional) Installing Temperature Sensors..................................................................................................... 178
4.2.9.5 Installing Remote T/H Sensors (33010516) for Smart Cooling Products................................................ 179
4.2.9.5.1 T/H Sensor Layout................................................................................................................................................... 179
4.2.9.5.2 Installing T/H Sensors.............................................................................................................................................181
4.2.9.6 Installing a Camera..................................................................................................................................................... 182
4.2.9.7 Installing an IVS1800..................................................................................................................................................186
4.2.9.8 Installing a Smart ETH Gateway and an ETH Converter............................................................................... 191
4.2.9.9 Routing the Cable to a WLDS900 Water Sensor.............................................................................................. 194
4.2.9.10 Installing an Electrode Water Sensor................................................................................................................. 199
4.2.9.11 (Optional) Installing an In-Room Access Actuator....................................................................................... 200
4.2.9.12 (Optional) Installing an In-Room Double Door Magnetic Lock?............................................................. 202
4.2.9.13 (Optional) Installing an In-Room Single Door Magnetic Lock................................................................. 205
4.2.9.14 (Optional) Installing an In-Room Fingerprint and Card Reader with a Keypad.................................208
4.2.9.15 (Optional) Installing an In-Room Fingerprint and Card Reader...............................................................210
4.2.9.16 (Optional) Installing an In-Room Card Reader with a Keypad.................................................................211
4.2.9.17 (Optional) Installing an In-Room Exit Button.................................................................................................213
4.2.9.18 (Optional) Installing an In-Room Emergency Door Release Button.......................................................213
4.2.9.19 (Optional) Installing an In-Room Camera....................................................................................................... 214
4.3 Cable Routing...................................................................................................................................................................... 215
4.3.1 System Cabling Rules.....................................................................................................................................................215
4.3.2 Cable Routes..................................................................................................................................................................... 219
4.3.3 Power Cable Routing..................................................................................................................................................... 222
4.3.4 Grounding the Smart Module.....................................................................................................................................222
4.3.5 Cable Connections to the Power Supply and Distribution System................................................................ 224
4.3.5.1 Top Cable Routing....................................................................................................................................................... 224
4.3.5.1.1 Cable Routing Description.................................................................................................................................... 224
4.3.5.1.2 (Optional) Connecting Cables to the ATS Subrack...................................................................................... 226
FusionModule800 Smart Small Data Center
User Manual
Contents
Issue 01 (2021-02-05)
Copyright © Huawei Technologies Co., Ltd.
vii