Figure 3-18 Securing an indoor unit
----End
3.8 Securing an Outdoor Unit
Prerequisites
●
The M10 expansion bolts used for securing an outdoor unit have been
prepared.
●
The concrete groundwork is prepared.
Context
NO TICE
● Move the outdoor unit close to the installation position before unpacking. You
are recommended to stand the outdoor unit during transportation. If tilt is not
avoidable, the tilt degree cannot exceed 15°.
● Do not hold the fan guard on the shell. Otherwise, it will be deformed.
● Do not touch the blades using hand or any other object.
● After installing the outdoor unit, remove the protective cardboard of condenser
fin.
NetCol8000-A013 In-room Air Cooled Smart Cooling
Product
User Manual (600 mm Width)
3 Installation Guide
Issue 02 (2020-11-09)
Copyright © Huawei Technologies Co., Ltd.
42