Step 6
Connect the other end of the network cable to the peer network port.
Connect the other cable connector to the peer device based on the network plan. Note the
following:
Connect the new network cable to the same port as the removed one.
Install the network cable in the network port securely.
Step 7
Check that the new network cable is operating properly.
Power on the device, and ping the peer device connected by the new network cable. If the
peer device cannot be pinged, check whether the network cable is damaged or connectors are
not secured.
Step 8
Bind the new network cable with other cables.
Bind the new network cable by using the same method as the existing one. You can also
remove all cable ties and bind all network cables again.
----End
2.4.3 Connecting a Cable to a 10GE Port
Background Information
You can connect an optical fiber or SFP+ cable to a 10GE port. You need to determine the
type of cable to be connected, depending on site requirements.
Operation Scenario
Connect a cable to a 10GE port in any of the following scenarios:
A 10GE network needs to be set up.
One or more optical fibers or SFP+ cables are not properly connected.
The existing optical fibers or SFP+ cables are not long enough after a network device is
replaced or migrated.
Prerequisites
1.
Precautions
The new and old cables must be of the same model or be compatible.
2.
Installation Preparations
−
The network plan is complete.
−
Spare cables are ready and placed near the target device.
3.
Tools
−
Phillips screwdriver: used to tighten screws.
−
ESD wrist strap or ESD gloves: used to prevent ESD damage.
Procedure
Step 1
Check the new network model.
Step 2
Number the new cable.