Step 4
Take the compute nodes out of the ESD bags and place them separately on the ESD floor.
NOTE
Take out the compute node only before you install it immediately.
Figure 4-3
Proper operation
Figure 4-4
Improper operations
----End
4.2.3 Installing Optional Parts
Before installing and configuring a compute node, you need to install all optional parts
required, such as extra CPUs, drives, and mezzanine cards.
Procedure
Step 1
Install the optional parts for the CH121 V5.
.
----End
FusionServer Pro CH121 V5 Compute Node
User Guide
4 Installation and Configuration
Issue 06 (2019-08-10)
Copyright © Huawei Technologies Co., Ltd.
74