Figure 3-20
Installing a PCIe card
Step 10
Install the air duct.
Step 11
Install the cover.
Step 12
Install the compute node.
.
Step 13
Power on the compute node.
----End
FusionServer Pro CH121 V5 Compute Node
User Guide
3 Basic Operations
Issue 06 (2019-08-10)
Copyright © Huawei Technologies Co., Ltd.
45