d.
Using a T-30 Torx screwdriver, tighten the nuts until they stop.
9.
If removed, do the following:
a.
Install the air baffle.
b.
Install the processor mezzanine tray.
c.
Install the 2P pass-through performance board.
10.
Install the access panel.
11.
Install the server into the rack.
12.
Connect each power cord to the server.