Procedure
1.
Power down the server (
on page 33).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
• Extend the server from the rack (
Extend the server from the rack
on page 33).
• Remove the server from the rack (
Removing the server from the rack
on page 34).
4.
Remove the access panel (
on page 35).
5.
Remove the PCIe riser cage (
Removing and replacing a PCIe riser cage
6.
Remove the blank.
The primary PCIe riser cage is shown.
Removing and replacing an expansion board
CAUTION:
To prevent damage to the server or expansion boards, power down the server and remove all AC power
cords before removing or installing the PCIe riser cage.
Procedure
1.
Power down the server (
on page 33).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
Removing and replacing an expansion board
53
Summary of Contents for ProLiant DL560 Gen10
Page 6: ...Warranty information 124 Regulatory information 125 Documentation feedback 125 6 Contents ...
Page 27: ...Customer self repair 27 ...
Page 28: ...28 Customer self repair ...
Page 29: ...Customer self repair 29 ...
Page 30: ...30 Customer self repair ...
Page 102: ...16 SFF backplanes Group C SAS cables 102 Cabling ...
Page 113: ...Quad slimline riser installed in the secondary PCIe riser cage Tertiary riser Cabling 113 ...