Airflow Optimization kit 18
3.
Insert the foam rail gasket into the space between the 19-in mounting rails and the vertical frame on both
sides of the rack, with the closed cell side of the foam rail gasket facing the front of the rack.
4.
Gently push the foam rail gasket into the space until it is flush with the vertical frame.
Installing foam rail gaskets between racks
CAUTION:
The foam rail gasket must be installed into the rack before two or more racks can be
bayed together. For additional information on baying racks, see the
HP Baying Rack Option Kit
.
If installing the foam rail gasket between racks that have a baying kit installed, the baying bracket must be
removed before the foam rail gasket can be inserted between the racks.
1.
Position the racks side by side.
2.
Cut the foam rail gasket to fit the size of your rack.
Summary of Contents for HP 10000 G2 Series
Page 35: ...Cable Management Bracket kit 35 Installation is complete ...
Page 74: ...Hook and Loop Cabling Strap Clip kit 74 ...
Page 75: ...Hook and Loop Cabling Strap Clip kit 75 Installation is complete ...
Page 104: ...Rack Air Duct kit 104 For more information see Baying kit on page 25 ...
Page 125: ...Vertical PDU Mounting kit 125 HP monitored PDU 2 Install the PDU The installation is complete ...