Rack Air Duct kit 99
c.
Insert one M5.5 self-tapping screw into each bottom corner of the assembly (3).
d.
Repeat steps a through c for the other side panel.
2.
Assemble the upper duct.
a.
Align the hooks of the side panels with the slots of the front and back panels (1).
b.
Slide the six hooks into the slots, and then slide the panel down until it locks in place (2).
c.
From the inside of the assembly, insert two M6 cap screws in the middle of the assembly. Using an
adjustable wrench, secure the screws from outside the assembly with an M6 star washer, an M6 flat
washer, and a nut (3).
d.
Repeat steps a through c for the other side panel.
3.
Install the draw-latch straps to the upper duct assembly.
a.
Slide the draw-latch strap around the bottom of the upper duct assembly (1).
b.
Align the holes of the draw-latch strap with the holes of the upper duct assembly.
Summary of Contents for HP 10000 G2 Series
Page 35: ...Cable Management Bracket kit 35 Installation is complete ...
Page 74: ...Hook and Loop Cabling Strap Clip kit 74 ...
Page 75: ...Hook and Loop Cabling Strap Clip kit 75 Installation is complete ...
Page 104: ...Rack Air Duct kit 104 For more information see Baying kit on page 25 ...
Page 125: ...Vertical PDU Mounting kit 125 HP monitored PDU 2 Install the PDU The installation is complete ...